Refresh
Same layout. We change what you see: cabinets or their fronts, counters, fixtures, paint and lights.
- Cabinets or their fronts, counters and fixtures
- Paint and lights
- The same layout
Kitchens and bathrooms in Houston
We are the Arrieta family and a crew of eight. We explain every step, write down what it costs and what it includes, and don't start until you approve.

Investment
Each level includes labor, the materials on the list you approve and the permits when the job needs them. The number for your home goes in your written estimate.
Same layout. We change what you see: cabinets or their fronts, counters, fixtures, paint and lights.
Same layout, everything new: cabinets, counters, floor, tile, finish plumbing and lighting.
The layout changes: walls, pipes or the range move, with permits and drawings.
None of them includes appliances, repairs to what turns up behind a wall, or changes you ask for during the job; each of those is priced separately, in writing, before the work. A home built before 1978 can need extra steps.
What we do
Each service has its own page with what it includes, what changes the cost and how the job goes day by day.

Cabinets, counters, floor, tile and lighting. From changing the fronts to moving the range.
See kitchens
Floor, tile, shower, vanity and lighting, with a day-by-day schedule.
See bathrooms
A step-free entry, a bench, grab bars and a non-slip floor.
See showers
Change what you see, leave the pipes where they are.
See cabinetsWarranty
It is written into the contract and reads the same here. The term and scope are this sample's; the owner confirms them before publishing.
Defects in our workmanship: a joint that opens, a cabinet that isn't level, a leak at a connection we installed, a tile that lifts.
One year on labor from the day of final handover, signed by you and by us. Products carry their maker's own warranty.
Normal wear, impact damage, water damage coming from elsewhere in the house, and repairs someone else made over our work.
Write or call and say what's happening, with a photo. We tell you when we're coming to look. If the defect is in our work, we fix it without charging you for labor.
Materials
Before ordering anything we bring tile, counter and cabinet samples to your home, to see them in your light and beside your floor.
We choose together and everything goes on a materials list with delivery dates. Almost everything that delays a job is a material that arrived late, and that list is how you see it coming.
Samples in your home
Materials list with dates
Changes always in writing

How we work
A bathroom usually takes two to four weeks on site and a kitchen four to eight; the written estimate gives the time for your home.
A member of the family comes to your home, measures, looks at the pipes and walls, and listens to what you want. The visit takes about an hour.
The scope, the materials on the list, what is not included and the estimated time, in one document you can compare with others.
We choose tile, cabinets and counters together. Before starting we confirm delivery dates, because almost everything that delays a job arrives late.
We sign the contract with the payment schedule. If the job needs a city permit, we file it and you see it.
You know who arrives each day. Every afternoon we send photos on WhatsApp and tell you if there is something to decide.
We walk the job together with a punch list. The labor warranty starts the day you sign the handover.
What they say
“They explained everything in Spanish, from the contract to the color of the grout. The bathroom was finished in the weeks they had told us.”
“We took out the tub for my mother. Every afternoon they sent photos on WhatsApp and we knew who was coming the next day.”
“The estimate came split into line items and that helped us compare it. They changed cabinets and counters without moving the range.”
Sample reviews.
Areas we serve
We work inside these areas. If your neighborhood isn't listed, message us with your ZIP code and we'll tell you honestly whether we can come.

We don't work north of Montgomery County, on Galveston Island or south of Rosharon.
Questions
It depends on size, whether the layout changes, the materials and the age of the house. The number for your home comes in writing after the visit.
The whole crew speaks Spanish. Cielo, Jazlyn, Nahomi and Anastasio also speak English, and Cielo is the one who talks to inspectors, neighbors and your neighborhood association when needed.
Almost always when plumbing, electrical, walls or the range location change. Swapping cabinets, painting or tiling over the same surface usually doesn't need one. The rules differ between the City of Houston and other municipalities; we check and file when it applies.
The federal EPA lead rule (RRP) covers homes built before 1978 when more than 6 square feet of paint per room is disturbed indoors, more than 20 square feet outdoors, or any time windows are replaced or walls demolished. In those cases floors and furniture are covered with plastic, the area is sealed off and cleaned with a HEPA vacuum. We don't dry-sand or burn old paint. Tell us the year of your home on the first call.
It happens in homes of any age: moisture, old pipes, poorly run wires. We stop, show you photos and give the cost of the fix in writing. No change goes ahead without your signature.
The deposit and payment schedule are written into the contract, in parts that follow the progress of the job, and the last payment comes only after the final walkthrough. The amount is set by the contract within what Texas law allows; the owner confirms it.
Estimate
Tell us about your kitchen or bathroom. The visit takes about an hour: we measure, look at visible pipes and walls and leave you the scope in writing. It costs nothing and commits you to nothing.