Tub to shower

A shower with a step-free entry.

We take out the tub and build a shower with a bench, grab bars and a non-slip floor, so a person of any age can step in comfortably.

It is one of the most requested jobs from families with an older parent at home. It fits in a standard bathroom without touching the rest of the room, and the grab bars are anchored into blocking behind the wall.

What's included

  • Removal of the tub and old tile

  • Blocking in the wall for the bars

  • A floor sloped to the drain

  • Bench, niche and hand shower

  • Tile or panels up to the ceiling

Marble-look tile shower with glass door, grab bar and mosaic floor

What changes the cost

Four things move the number.

The number for your home goes in the written estimate, after the visit.

  • Step-free entry

    Lowering the shower floor level with the bathroom can mean opening the floor and moving the drain, and that changes the cost.

  • Tile or panels

    Panels are faster; tile gives more choices and takes more days.

  • Door or curtain

    A glass door is made to size; a curtain isn't. Both work with a step-free entry.

  • Bathroom size

    In a narrow bathroom, the bench and a level entry can mean moving the vanity.

How it goes

Step by step, with who arrives each day.

  1. 01

    Step 1: Measuring and choosing

    We measure the tub, the drain and the floor below. Tile, bench and bars are chosen.

  2. 02

    Step 2: Tub removal

    One to two days, with the area covered and dust contained.

  3. 03

    Step 3: Floor, slope and waterproofing

    Three to four days, with the drying time the product asks for.

  4. 04

    Step 4: Tile, bench and bars

    Four to six days. The bars go on the blocking already installed.

  5. 05

    Step 5: Handover

    We test the water, the drain and the bars together and sign the handover.

Permits

Permits and rules.

If the drain or pipes move, a permit is needed. A finish-only change doesn't. If the home was built before 1978, the EPA lead steps apply too. We check and file it.

Examples

Sample jobs.

Shower with a black glass mosaic stripe, pebble floor and a white door
Non-slip pebble floor and a mosaic stripe
Tub and shower with white walls beside a wood vanity and toilet
Before a conversion: a tub with a panel surround
Shower in progress with a half wall, wall niches and green tape beside a tub
In progress: half wall, niches and blocking for bars

Sample photos.

Questions

What people ask about this.

How long does swapping a tub for a shower take?

One to three weeks on site, depending on whether the floor and drain change. You get a day-by-day schedule.

Can you install grab bars?

Yes. They go on wood blocking behind the tile, at the height you and your family need.

Is it all right to have no tub?

It's each family's decision, and sometimes about a future sale. We tell you honestly what you lose and gain in your case, without promising a resale value.