Refresh
Same layout. We change what you see: cabinets or their fronts, counters, fixtures, paint and lights.
- Cabinets or their fronts, counters and fixtures
- Paint and lights
- The same layout
Investment
Cost guides don't agree with each other, so we don't give you an average. After the visit, we give you the number for your home, in writing.
The square feet of floor, wall and counter.
Moving pipes, a wall or the range.
Cabinets, counters and tile; the gap between stock and custom.
Old installations and, before 1978, the lead steps.
When the job needs them, they go in the estimate.
Investment
Each level includes labor, the materials on the list you approve and the permits when the job needs them. The number for your home goes in your written estimate.
Same layout. We change what you see: cabinets or their fronts, counters, fixtures, paint and lights.
Same layout, everything new: cabinets, counters, floor, tile, finish plumbing and lighting.
The layout changes: walls, pipes or the range move, with permits and drawings.
None of them includes appliances, repairs to what turns up behind a wall, or changes you ask for during the job; each of those is priced separately, in writing, before the work. A home built before 1978 can need extra steps.
The estimate
| Topic | Not included | Included |
|---|---|---|
| Labor | Not includedWork you ask for after signing | IncludedThe crew you know by name |
| Materials | Not includedAnything not on the list | IncludedThe ones on the list you approve |
| Permits | Not includedPermit drawings and 3D design, quoted separately | IncludedFiling and fees when the job needs them |
| Appliances | Not includedBuying them, unless you ask | IncludedInstalling them |
| Surprises | Not includedFixing what turns up behind a wall | IncludedPhotos and a written cost before continuing |
Questions
It depends on size, whether the layout changes, the materials and the age of the house. The number for your home comes in writing after the visit.
The one-hour visit, the measurements, a look at visible pipes and walls, and the scope in writing. It does not include permit drawings or 3D design; if you need them, we say so first and price them separately.
The deposit and payment schedule are written into the contract, in parts that follow the progress of the job, and the last payment comes only after the final walkthrough. The amount is set by the contract within what Texas law allows; the owner confirms it.
It happens in homes of any age: moisture, old pipes, poorly run wires. We stop, show you photos and give the cost of the fix in writing. No change goes ahead without your signature.
After the visit, the estimate arrives in writing.